OBJECTIVE:
- Repair of existing defects in the Pagoreni A – B pipeline and application of non-metallic composite matrix reinforcements (carbon fiber – epoxy).
DEVELOPMENT:
- Repair of defects caused by a power shovel during work carried out on the wet gas flow line in the Pagoreni area.
- Application of 03 non-metallic reinforcements of composite matrix (Carbon fiber – epoxy) to the flow line of 18 Plg.
- Product applied Diamond Wrap Hp (Carbon Fiber + Resin).
- Verification of the rigidity and hardness of the applied product.
- Development of technical repair report.
Client Company: