OBJECTIVE:
- Basic and detailed engineering for the cathodic protection of the main tailings pipeline of the “Constancia project”.
DEVELOPMENT :
- Work done:
- Ground resistance measurement.
- Chemical analysis tests.
- Design of the cathodic protection system.
- Permanent SPC Design Report – Pipeline.
- Resistivity profile report.
- Soil aggressiveness report.
- Manuals.
- Line diagrams.
- Metering of Materials.
- Preparation of construction reports and recommendations for the cathodic protection system to be installed.
- Detailed construction plans.