- Topographic Survey. Topographic Plans.
- Environmental diagnosis
- Layout of the TGP Pipelines (Pk 412+000 and 414 +000) and PLNG (214+144 and 216+886 according to COLP As Built data).
- Design and technical-constructive feasibility.
- Budget for Changing Layout. CAPEX. Class 4 of the AACE standard No. 18R-97.
Client Company: