Layout of both TGP and PLNG pipelines in the Tambo dam area

Client Company:

  • Topographic Survey. Topographic Plans.
  • Environmental diagnosis
  • Layout of the TGP Pipelines (Pk 412+000 and 414 +000) and PLNG (214+144 and 216+886 according to COLP As Built data).
  • Design and technical-constructive feasibility.
  • Budget for Changing Layout. CAPEX. Class 4 of the AACE standard No. 18R-97.